EtherCAT and commissioning

Configure and verify the EtherCAT system before commissioning motion.

Commissioning order

  1. Supported slaves — select hardware and find its configuration files.
  2. Advanced EtherCAT and commissioning — configure domains, data items, DC, verification, and topology handling.
  3. EtherCAT endpoint timing — configure delays, phase, timestamps, and diagnostic PVs.
  4. Verify DC timing with position compare — check timed outputs against a touch probe.

Test without physical EtherCAT

Simulation backend (SIM=1) uses typed memory with the normal signal names. Separate Python models provide drive feedback; generated SIM PVs support manual injection and a live GUI.

Additional configuration

For communication faults, use the EtherCAT command line guide and hardware notes.